14,252.38 TRY BIST 100 BIST 100
52.76 EUR EUR EUR
44.76 USD USD USD
6.60 CNY CNY CNY
0.13 CNY CNY/EUR CNY/EUR
39.69 TRY Interest Interest
94.84 USD Fossil Oil Fossil Oil
6.12 USD Copper Copper
115.72 USD Silver Silver
106.08 USD Iron Ore Iron Ore
378.00 USD Shipbreaking Scrap Shipbreaking Scrap
6,955.95 TRY Gold (gr) Gold (gr)
105.00 USD Iron Ore 61% Fe Iron Ore 61% Fe

Hyundai Steel accelerates US DRI investment with pilot plant in Dangjin

Hyundai Steel is establishing a pilot plant at its Dangjin steelworks in South Chungcheong Province to accelerate preparations for a large-scale direct reduced iron (DRI) facility to be built in Louisiana, US.

Hyundai Steel accelerates US DRI investment with pilot plant in Dangjin

The pilot plant will test reduction processes using hydrogen and natural gas, providing critical technical data for the company’s US investment.

According to industry sources, Hyundai Steel recently began construction of the pilot facility in Dangjin, which will have the capacity to produce 30 kilograms of molten iron per hour. The plant is scheduled to become operational next year.

The pilot facility will be around one percent the size of the large-scale unit planned for the US.

The Dangjin pilot plant is designed to be approximately one percent the scale of the full DRI equipment to be installed at the Louisiana facility. This small-scale model will allow Hyundai Steel to gather key data, including feedstock cost calculations for reduction materials, methods for capturing and reusing exhaust gases, and ways to optimize production efficiency.

Based on these data, the company aims to commission the Louisiana plant smoothly and earlier than originally planned. These optimizations are also expected to directly contribute to the production of high-quality automotive steel sheets for US automakers.

Staff expansion for US investment

Hyundai Steel doubled the headcount of its North America business unit last year to accelerate the Louisiana project, as this team oversees construction of the plant. During the same period, the company intensified efforts to develop hydrogen-based reduction technology and expanded its specialist workforce within its low-carbon technology office.

The Louisiana plant, being built with an investment of USD 5.8 billion, will be the world’s first electric arc furnace integrated steelworks. The facility is planned to supply 2.7 million tonnes of steel products annually to manufacturers such as Hyundai Motor, Kia, Ford and General Motors. As part of the complex, a 100-metre-high DRI unit will also be installed to reduce iron ore pellets.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

Stegra joins the European Resilience Alliance for clean hydrogen

Friday, April 17, 2026

Iran announces that the Strait of Hormuz is fully open

Friday, April 17, 2026

First phase of Farigh–Brega natural gas pipeline commissioned in Libya

Friday, April 17, 2026

Union Pacific and Rocky Mountain Steel Mills sign 7-year agreement for domestic rail production

Friday, April 17, 2026

Fortescue speeds up green grid transition

Friday, April 17, 2026
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now