13,998.72 TRY BIST 100 BIST 100
53.84 EUR EUR EUR
47.07 USD USD USD
6.98 CNY CNY CNY
0.13 CNY CNY/EUR CNY/EUR
41.78 TRY Interest Interest
88.90 USD Fossil Oil Fossil Oil
6.33 USD Copper Copper
86.42 USD Silver Silver
100.33 USD Iron Ore Iron Ore
380.00 USD Shipbreaking Scrap Shipbreaking Scrap
6,089.00 TRY Gold (gr) Gold (gr)
99.00 USD Iron Ore 61% Fe Iron Ore 61% Fe

Shaping the future of steelmaking in Duqm

The Direct Reduced Iron (DRI) reactor vessel, weighing 870 metric tons, was successfully delivered to the Jindal Steel Duqm project site in accordance with the planned logistics and engineering processes.

Shaping the future of steelmaking in Duqm

In a defining moment for one of the region’s largest industrial investments, the Jindal Steel Duqm project has successfully crossed its most critical operational readiness milestone to date. The 870-metric-tonne Direct Reduced Iron (DRI) Reactor Vessel, which will serve as the definitive heartbeat of the plant’s iron-making operations, has safely arrived at the project site. This achievement marks a major turning point in heavy industrial engineering, bringing the facility significantly closer to production.

Transporting a mega-structure of this magnitude required months of meticulous planning and the deployment of advanced logistics technology:

Maritime Integration: The massive equipment made its initial landfall at the Port of Duqm via a specialized cargo barge, completing its sea transit seamlessly.

Advanced Onshore Logistics: For the overland transfer to the construction site, the heavy-lift team utilized cutting-edge SPMT (Self-Propelled Modular Transporters) and RoRo (Roll-On/Roll-Off) systems.

Precision Time Management: Driven by engineering precision and seamless teamwork, this complex and challenging transit was completed with zero errors over a rigorous 14-hour journey.

The arrival of this critical equipment signals the project’s official transition from foundational civil works to advanced mechanical installation. With this milestone, Jindal Steel is doing more than just building a modern plant; it is establishing a world-class metallurgical infrastructure that underscores its commitment to shaping the future of global steel production.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

New chapter for the steel tube industry: Hoberg & Driesch and ATTEC unite under one roof

Saturday, July 18, 2026

Ermaden launches EIA process for major investment in Divriği, Sivas

Friday, July 17, 2026

Freight rates on the Iran-China route remain stable

Monday, June 29, 2026

Energy efficiency and carbon reduction grant support introduced

Monday, June 29, 2026
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now