13,744.64 TRY BIST 100 BIST 100
53.44 EUR EUR EUR
46.17 USD USD USD
6.87 CNY CNY CNY
0.13 CNY CNY/EUR CNY/EUR
43.69 TRY Interest Interest
93.67 USD Fossil Oil Fossil Oil
6.21 USD Copper Copper
94.66 USD Silver Silver
101.39 USD Iron Ore Iron Ore
400.00 USD Shipbreaking Scrap Shipbreaking Scrap
6,089.00 TRY Gold (gr) Gold (gr)
101.00 USD Iron Ore 61% Fe Iron Ore 61% Fe

Leading Australian companies are launching the ESF project!

Leading Australian iron ore producers are launching a joint pilot project to develop a new steelmaking technology based on the use of the electric smelting furnace (ESF). The implementation of this technology will make it possible to replace blast furnaces and abandon the use of coking coal.

Leading Australian companies are launching the ESF project!

Leading Australian iron ore producers Rio Tinto and BHP, as well as the largest domestic steel producer BlueScope Steel, are launching a joint pilot project to develop a new steelmaking technology based on the use of the electric smelting furnace (ESF).

This technology consists of two stages. In the first stage, iron is reduced using natural gas or hydrogen. In contrast to the traditional process of producing reduced/hot briquetted iron (DRI/HBI), blast furnace pellets or even ore fines can be used in this case.

The resulting metalized pellets, which have a lower iron content than DRI/HBI, are sent to the ESF, where they are melted with the removal of impurities in the form of slags. The liquid metal then enters the oxygen converter, where the steel is smelted.

The implementation of this technology will make it possible to replace blast furnaces and abandon the use of coking coal. In the first step, green hydrogen can be used to reduce iron, and ESF can generate energy from renewable sources. Due to this, specific carbon dioxide emissions from steel smelting can be reduced by more than 80%.

The three participants in the project are going to jointly finance the building of a pilot plant that will use iron ore from Western Australia as a feedstock. The project is expected to be completed by 2027.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

Locally Produced TÜRASAŞ Locomotive to Be Exported to Tanzania

Sunday, June 14, 2026

Free Zones' Trade Volume Reached $11.7 Billion in the First Five Months of the Year

Sunday, June 14, 2026

SteelRadar Spoke with Resonac EMEA Specialist Daniel Benedeti at EFRS 2026

Sunday, June 14, 2026

Vale Launches AI-Powered “Usina Modelo” Facility in Itabira

Sunday, June 14, 2026

EUROFER: US tariffs cut European steel exports to the US by one-third

Monday, June 8, 2026
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now