10,853.49 TRY BIST 100 BIST 100
40.67 USD USD USD
5.70 CNY CNY CNY
46.95 EUR EUR EUR
0.12 CNY CNY/EUR CNY/EUR
39.78 TRY Interest Interest
68.54 USD Fossil Oil Fossil Oil
48.98 USD Silver Silver
4.45 USD Copper Copper
101.64 USD Iron Ore Iron Ore
332.00 USD Shipbreaking Scrap Shipbreaking Scrap
4,407.48 TRY Gold (gr) Gold (gr)

Severstal improves the quality of hot rolled products

Cherepovetsky Metallurgical Plant reconfigured the crosscutting unit number 2 (APR-2). The cost of the upgrade was more than 400 million rubles.

Severstal improves the quality of hot rolled products
"In the process of implementation of the investment project, we installed a new sheet straightening machine, assembled gear motors for the drive of hydraulic stations and drawing cylinders, and partially replaced the electronics. Despite the challenging situation in the industry, we continue to invest in the technological development of our production. The modernization of end-class units close to the customer allows us to simultaneously improve product quality and production efficiency, and support market demand. In particular, the rearrangement of the APR-2 increases the production capacity of hot-rolled sheets with a guarantee of flatness up to 5 mm per meter. "After the reconstruction of the APR-2, the technical capabilities of all the main hot-rolled cutting units at the CirMK site make it possible to achieve product quality for civil and mechanical engineering at the level of industry best practices." 
The modernization of the APR-2 made it possible to allow for the operation planning of cross-cutting units, as well as to increase the production of particularly complex and first-class products. This is especially true for high-strength Powerform steels as well as for rolling for Steelazer – laser cutting of metal – a metal with evenly spaced internal stresses and improved flatness achieved by special regulation modes in the cutting unit.
Specialists from Severstal's core contracting organizations, including companies from the Vologda District, the site where the Chermk is located, were involved in the reconstruction of APR-2.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

The EU has temporarily suspended additional tariffs on US-origin products

Tuesday, August 5, 2025

Nippon Steel and Vestas provide strong support for Japan's wind energy targets

Tuesday, August 5, 2025

Statement from ÇİB on the EU's scrap surveillance system

Tuesday, August 5, 2025

NEOM Port reduces transit time on the Egypt-Saudi Arabia-Iraq route by more than 50%

Tuesday, August 5, 2025

Pyro Green-Gas has completed the installation of a hydrogen production and gas purification system at Tata Steel's facility in India

Tuesday, August 5, 2025
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now