Steel Network
13,407.44 TRY BIST 100 BIST 100
51.79 EUR EUR EUR
43.42 USD USD USD
6.28 CNY CNY CNY
0.12 CNY CNY/EUR CNY/EUR
34.13 TRY Interest Interest
69.26 USD Fossil Oil Fossil Oil
13,407.44 USD Copper Copper
168.08 USD Silver Silver
103.38 USD Iron Ore Iron Ore
351.00 USD Shipbreaking Scrap Shipbreaking Scrap
7,761.05 TRY Gold (gr) Gold (gr)
104.00 USD Iron Ore 61% Fe Iron Ore 61% Fe

Severstal improves the quality of hot rolled products

Cherepovetsky Metallurgical Plant reconfigured the crosscutting unit number 2 (APR-2). The cost of the upgrade was more than 400 million rubles.

Severstal improves the quality of hot rolled products
"In the process of implementation of the investment project, we installed a new sheet straightening machine, assembled gear motors for the drive of hydraulic stations and drawing cylinders, and partially replaced the electronics. Despite the challenging situation in the industry, we continue to invest in the technological development of our production. The modernization of end-class units close to the customer allows us to simultaneously improve product quality and production efficiency, and support market demand. In particular, the rearrangement of the APR-2 increases the production capacity of hot-rolled sheets with a guarantee of flatness up to 5 mm per meter. "After the reconstruction of the APR-2, the technical capabilities of all the main hot-rolled cutting units at the CirMK site make it possible to achieve product quality for civil and mechanical engineering at the level of industry best practices." 
The modernization of the APR-2 made it possible to allow for the operation planning of cross-cutting units, as well as to increase the production of particularly complex and first-class products. This is especially true for high-strength Powerform steels as well as for rolling for Steelazer – laser cutting of metal – a metal with evenly spaced internal stresses and improved flatness achieved by special regulation modes in the cutting unit.
Specialists from Severstal's core contracting organizations, including companies from the Vologda District, the site where the Chermk is located, were involved in the reconstruction of APR-2.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

Tenaris signed a contract with TPAO for the Sakarya Gas field phase 3 project

Thursday, January 29, 2026

Liberia extends mining agreement with ArcelorMittal until 2050

Friday, January 30, 2026

MMK sets new galvanized pipe production record in 2025

Saturday, January 31, 2026

India designates coking coal as a critical mineral due to steel import dependence

Friday, January 30, 2026

Tata Steel stated that it could benefit from the planned changes to the UK steel quotas

Friday, January 30, 2026
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now