13,744.64 TRY BIST 100 BIST 100
6.89 CNY CNY CNY
53.70 EUR EUR EUR
46.30 USD USD USD
0.13 CNY CNY/EUR CNY/EUR
43.69 TRY Interest Interest
93.67 USD Fossil Oil Fossil Oil
6.21 USD Copper Copper
94.66 USD Silver Silver
102.24 USD Iron Ore Iron Ore
400.00 USD Shipbreaking Scrap Shipbreaking Scrap
6,089.00 TRY Gold (gr) Gold (gr)
102.00 USD Iron Ore 61% Fe Iron Ore 61% Fe

SSAB and SMS Group Signed Contract

SSAB and SMS Group have signed a contract for the ongoing hot dip galvanising line no.3 in Finland...

SSAB and SMS Group Signed Contract

SSAB and SMS Group have signed a contract for the ongoing hot dip galvanising line no.3 in Finland.
In the "Furnace System", no waste-generating acids and chemicals are used. All rolling mill wastes such as iron oxide, ash, scale and rolling oils on the surface of the raw material are cleaned by passing through a giant furnace. Firstly, the sheet, which passes through the section where 80 natural gas burners are placed, where the flame directly contacts the sheet surface, is then subjected to the HNX gas atmosphere, which is completely free of oxygen. At this stage, the sheet metal, which is heated to 750-800 0C in line with the desired quality, is then plunged into the zinc pot and galvanised.

This contract actually covers the combination of drying-cooling (Air Knife System) and furnace supporters in the line and the balancing of the line. The pre-project investigations and measures are expected to be completed by the end of 2017. The main elements of the project are to increase the efficiency and capacity of the line and to enable efficient production of high quality for strong automotive grades. The new concept for the modernisation is based on extensive studies prepared by the SMS Group for the optimisation of SSAB's galvanising line. These change studies will be implemented in a joint effort with DREVER International, DUMA-BANDZINK, EMG Automation and all companies of the SMS Group. The line will be designed with a thickness of 0.4 to 3.0 millimetres and a width of 650 to 1550 millimetres. In the process, the line will be zinc-coated and the speed will reach 16 kilometres per minute.

The temperature inside the furnace will be 350 C, which will increase the capacity and improve the quality of the furnace's production, resulting in a high-strength and robust product on many levels.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

Ali Sezen: “Ukraine will not be a threat to Turkish steel in the short term; it will become its largest export market”

Tuesday, June 16, 2026

Steel Con signs USD 2 million metal industry investment in East Port Said

Tuesday, June 16, 2026

Oğuzhan Üçok: Even if Hormuz reopens, steel and shipping trade will take 3–4 months to normalize

Tuesday, June 16, 2026

Ali Der: "The reopening of Hormuz will bring at least a 10% price correction in steel prices"

Tuesday, June 16, 2026

LKAB receives environmental approval for mining operations and fossil free sponge iron investment

Tuesday, June 16, 2026
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now