Steel Network
13,787.82 TRY BIST 100 BIST 100
43.64 USD USD USD
6.35 CNY CNY CNY
52.01 EUR EUR EUR
0.12 CNY CNY/EUR CNY/EUR
590.00 TRY Interest Interest
69.47 USD Fossil Oil Fossil Oil
5.95 USD Copper Copper
117.20 USD Silver Silver
99.46 USD Iron Ore Iron Ore
351.00 USD Shipbreaking Scrap Shipbreaking Scrap
7,108.40 TRY Gold (gr) Gold (gr)
99.00 USD Iron Ore 61% Fe Iron Ore 61% Fe

LHG targets 25 million tons of iron ore production with R$ 4 billion investment

Brazil-based LHG Mining Corumbá SA is preparing to invest R$ 4 billion in the rural area of Corumbá to increase iron ore and manganese production at the Santa Cruz Mine.

LHG targets 25 million tons of iron ore production with R$ 4 billion investment

The company aims to raise its current annual production capacity from 12 million tons to 25 million tons.

The Government of Mato Grosso do Sul has declared 845.9775 hectares of land located across 12 farm sections in Corumbá, owned by LHG under the control of the J&F Group, as being of public interest. The area will be used for the installation of a Long-Distance Belt Conveyor and a Railway Terminal and Product Storage Facility. The decision is considered part of the company’s expansion strategy launched after LHG took over mining operations in the region from Vale in 2022.

The designated logistics route passes through nine different properties, five of which are directly owned by LHG. The state administration has defined the project as a strategic investment and stated that the expropriation process may proceed in accordance with legal procedures, subject to prior valuation and fair compensation to rights holders.

Due to uncertainties surrounding investments in the Malha Oeste railway, the company has turned to waterway transportation as an alternative. In this context, LHG received financing approval of R$ 3.7 billion from the Brazilian National Bank for Economic and Social Development for the construction of barges and tugboats to strengthen transport along the Paraguay-Paraná Waterway.

Meanwhile, the Federal Government plans to launch a tender to open the railway line between Corumbá and Mairinque to private capital. To facilitate the concession process, the option of dividing the line into separate lots is also being evaluated. In addition, a new concession model is planned for the Paraguay-Paraná Waterway, aiming to carry out targeted dredging works and improve navigation conditions.

LHG’s increase in iron ore production capacity is expected to accelerate the restructuring of logistics infrastructure within Brazil’s export-oriented mining sector.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

Expectations for economic recovery in Russia have been pushed back to 2027

Thursday, February 12, 2026

Chinese economists call for easing capital controls

Thursday, February 12, 2026

Vietnam announces new roadmap for steel industry through 2050

Wednesday, February 11, 2026

Tata Steel warns government as UK steel sector faces critical risk

Wednesday, February 11, 2026
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now