11,000.26 TRY BIST 100 BIST 100
48.53 EUR EUR EUR
41.33 USD USD USD
5.84 CNY CNY CNY
0.12 CNY CNY/EUR CNY/EUR
39.90 TRY Interest Interest
67.51 USD Fossil Oil Fossil Oil
56.61 USD Silver Silver
4.68 USD Copper Copper
105.81 USD Iron Ore Iron Ore
335.00 USD Shipbreaking Scrap Shipbreaking Scrap
4,889.56 TRY Gold (gr) Gold (gr)

Kroman Çelik's 94 million liras new facility in Gebze

Kroman Çelik prepared an EIA report for the 'Non-Hazardous Waste Recovery and Landfill Facility' to be built in Gebze. The company will pre-process the slag wastes to be generated in the iron and steel plant in the new facility.

Kroman Çelik's 94 million liras new facility in Gebze

In the 99 thousand 32 square metre facility, Kroman Çelik will crush and separate slag wastes in a crushing-separation unit, and the resulting material will be used for the closure of highways, abandoned quarries and open pit mines whose function has ended, and for land correction.

A cost of 94 million 320 thousand liras

Kroman Çelik, which has made an EIA application for the project, foresees a cost of 94 million 320 thousand liras for the new facility to be built on an area of 99 decares. Apart from this, the company will also recover the metal steel material to be obtained by means of magnetic separator and will reuse this material as raw material in the steel mill. The waste that cannot be recovered will be disposed of in the landfill site to be built within the scope of the project.

The decision of the Ministry of Environment, Urbanisation and Climate Change is expected for the project for which the EIA process has started.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

New Appointment at Thyssenkrupp Materials Services

Monday, September 15, 2025

ASSOFERMET: New EU measures threaten European industry

Monday, September 15, 2025

Statement from Kardemir regarding baseless allegations

Monday, September 15, 2025

Cogne, located in Aosta, has entered a new period in steel production with a green hydrogen facility.

Monday, September 15, 2025

Vallourec signed USD 1 billion OCTG contract with Petrobras

Monday, September 15, 2025
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now