14,393.85 TRY BIST 100 BIST 100
48.49 USD USD USD
7.27 CNY CNY CNY
56.28 EUR EUR EUR
0.13 CNY CNY/EUR CNY/EUR
39.76 TRY Interest Interest
105.61 USD Fossil Oil Fossil Oil
6.59 USD Copper Copper
100.22 TRY Silver Silver
98.10 USD Iron Ore Iron Ore
377.25 USD Shipbreaking Scrap Shipbreaking Scrap
6,089.00 TRY Gold (gr) Gold (gr)
97.00 USD Iron Ore 61% Fe Iron Ore 61% Fe

ArcelorMittal and China Oriental’s electric steel facility in China prepares for production

ArcelorMittal Jinxi New Materials, a joint venture established by ArcelorMittal and China Oriental Group in Changzhou, China, has unveiled its “AMORNEX” brand. The project is planned to have an annual electric steel production capacity of 1.8 million tonnes and is expected to commence production in mid-2027.

ArcelorMittal and China Oriental’s electric steel facility in China prepares for production

ArcelorMittal Jinxi New Materials (Changzhou) officially unveiled its “AMORNEX” brand on September 9, 2026. Established jointly by ArcelorMittal and China Oriental Group, the company will develop new energy magnetic material solutions focused on electrical steel.

Located in the Binjiang Economic Development Zone in Changzhou, Jiangsu Province, the project is planned to have a total annual electrical steel production capacity of 1.8 million tonnes. The first phase of the project will have an annual production capacity of 500,000 tonnes of high-performance non-oriented electrical steel.

Transition from construction to equipment installation

According to the latest information released in September, the plant’s main structure has largely been prepared for equipment installation. Pile foundations, the main plant foundation, steel structures and equipment foundations for the main production line have been completed, while overhead cranes inside the plant have also been installed. As a result, the project has shifted its focus from construction to equipment installation.

The base plate of the CTCM six-high tandem cold rolling mill, one of the plant’s key production units, has been installed and alignment work has been carried out. Installation of the rolling mill stands is scheduled to be completed by the end of September 2026. Alongside construction activities, customer discussions, technical approval processes for products and marketing activities are also underway.

Production scheduled to start in 2027

Construction of the plant began in September 2025, with production targeted to commence in mid-2027. The electrical steel products to be manufactured under the AMORNEX brand are planned for use in drive motors for new energy vehicles, high-efficiency industrial motors, power generation equipment, premium home appliances, servo motors for robots and advanced air mobility vehicles.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

Daido Steel completes new high alloy steel line at Chita facility

Friday, September 11, 2026

Alan Lovell appointed Chairman of British Steel

Friday, September 11, 2026

UK extends antidumping measure on wire rod imports from China

Friday, September 11, 2026

Salzgitter AG appoints Christoph Martin as new CFO

Friday, September 11, 2026
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now