14,497.37 TRY BIST 100 BIST 100
53.53 EUR EUR EUR
46.84 USD USD USD
6.93 CNY CNY CNY
0.13 CNY CNY/EUR CNY/EUR
40.22 TRY Interest Interest
76.53 USD Fossil Oil Fossil Oil
6.21 USD Copper Copper
91.65 USD Silver Silver
97.90 USD Iron Ore Iron Ore
380.00 USD Shipbreaking Scrap Shipbreaking Scrap
6,089.00 TRY Gold (gr) Gold (gr)
97.00 USD Iron Ore 61% Fe Iron Ore 61% Fe

U.S. Steel is restarting the second coke battery at Mon Valley Works

Following explosions at U.S. Steel's Clairton Coke Plant, the largest coke production facility in the U.S., in August last year that killed two workers and injured 11 others, the plant is preparing to resume operations on one of its production lines.

U.S. Steel is restarting the second coke battery at Mon Valley Works

The company announced that work would resume on Thursday at the second coke battery located at its No. 13 production facility within Mon Valley Works.

The first of three separate explosions occurred at around 10:45 a.m. on August 11. Two separate independent investigations into the incident were launched by Engineering Design and Testing Corp. and the U.S. Chemical Safety and Hazard Investigation Board. The investigations found that the explosions occurred in the transfer area of coke batteries 13 and 14 while workers were opening and closing valves as part of planned maintenance. The Board's report stated that the gas monitoring alarm was activated before the explosion and that workers were instructed to evacuate. The report prepared by the company stated that the explosion occurred as a result of combustible coke oven gas escaping due to damage to an 18-inch cast iron valve.

Coke ovens are defined as large industrial structures consisting of many narrow and long ovens. In these ovens, coal is exposed to high temperatures in an oxygen-free environment to produce coke, which is then used in steel production. Following the explosions in August, the facility was placed in “hot standby” mode, meaning heating was maintained but no coke production took place. U.S. Steel officials said this period was used for repair work and equipment checks.

Amanda Malkowski, senior media relations manager at U.S. Steel, announced that work at the No. 13 production facility would begin on Thursday, with coke production scheduled to resume on Friday. Malkowski stated that the Allegheny County Health Department had been informed of the restart process and that the process would be closely monitored. It was noted that with the battery back online, emission control systems would be active and emissions would be continuously monitored.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

Baosteel commissions new slab caster supplied by Primetals Technologies

Wednesday, July 8, 2026

Greensteel Australia to build Australia's first fully electric steel plant with USD 500 million investment in Newcastle

Wednesday, July 8, 2026

Dalbeler: EU's new steel quota could result in USD 3 billion export loss

Wednesday, July 8, 2026

US steel shipments rise 8.5% year on year in May

Wednesday, July 8, 2026

American steel market prices remain strong

Tuesday, July 7, 2026
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now