11,000.26 TRY BIST 100 BIST 100
48.53 EUR EUR EUR
41.33 USD USD USD
5.84 CNY CNY CNY
0.12 CNY CNY/EUR CNY/EUR
39.90 TRY Interest Interest
67.51 USD Fossil Oil Fossil Oil
56.61 USD Silver Silver
4.68 USD Copper Copper
105.81 USD Iron Ore Iron Ore
340.00 USD Shipbreaking Scrap Shipbreaking Scrap
4,889.56 TRY Gold (gr) Gold (gr)

LISCO shatters records: Achieves design capacity after 26 years

In a significant development for the Libyan Iron and Steel Company (LISCO), the company has proudly announced the successful attainment of the design capacity at its Direct Reduced Iron (DRI) plant for the first time in 26 years.

LISCO shatters records: Achieves design capacity after 26 years

In a significant development for the Libyan Iron and Steel Company (LISCO), the company has proudly announced the successful attainment of the design capacity at its Direct Reduced Iron (DRI) plant for the first time in 26 years. The DRI plant's production soared to an impressive 650 thousand tons of Hot Briquetted Iron (HBI), perfectly aligning with the long-awaited design capacity of the facility. 

After years of meticulous planning, strategic investments, and dedicated efforts, LISCO has reached a historic milestone in the production of Direct Reduced Iron. The achievement marks a major turnaround for the company and the Libyan industrial sector as a whole.

The DRI plant, a vital component of LISCO's operations, has faced numerous challenges over the past two and a half decades, including political instability, economic downturns, and technical issues. However, the recent success demonstrates the resilience and determination of the company to overcome obstacles and revive its industrial capabilities.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

New Appointment at Thyssenkrupp Materials Services

Monday, September 15, 2025

ASSOFERMET: New EU measures threaten European industry

Monday, September 15, 2025

Statement from Kardemir regarding baseless allegations

Monday, September 15, 2025

Cogne, located in Aosta, has entered a new period in steel production with a green hydrogen facility.

Monday, September 15, 2025

Vallourec signed USD 1 billion OCTG contract with Petrobras

Monday, September 15, 2025
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now