13,744.64 TRY BIST 100 BIST 100
6.89 CNY CNY CNY
53.11 EUR EUR EUR
46.36 USD USD USD
0.13 CNY CNY/EUR CNY/EUR
43.69 TRY Interest Interest
93.67 USD Fossil Oil Fossil Oil
6.21 USD Copper Copper
94.66 USD Silver Silver
99.41 USD Iron Ore Iron Ore
400.00 USD Shipbreaking Scrap Shipbreaking Scrap
6,089.00 TRY Gold (gr) Gold (gr)
99.00 USD Iron Ore 61% Fe Iron Ore 61% Fe

Yeşilyurt Demir Çelik will build a solar power plant to produce its own electricity

Yesilyurt Demir Celik will install a 95 MW solar power plant in Hilvan. The electricity produced will be used for the company's own consumption.

Yeşilyurt Demir Çelik will build a solar power plant to produce its own electricity

Yesilyurt Demir Celik will establish a 95 MWe solar power plant named 'Yesilyurt Hilvan Solar Power Plant (SPP)' in the Hilvan district of Sanliurfa to reduce its carbon footprint in line with its climate goals.

After setting up an 80 MW solar power plant in Viransehir, the company plans to install another solar power plant in Hilvan.

The company plans to establish and operate a 95 MWe solar power plant named 'Yesilyurt Hilvan Solar Power Plant (SPP)' in an area of 116.54 hectares within the boundaries of the Hilvan district in Sanliurfa. The project is expected to require an investment of approximately 996 million TL.

At the power plant, the direct current electricity produced by Monocrystalline Single Axis Sun Tracking Photovoltaic Systems will be converted to alternating current electricity using inverters. The project will involve the installation of 199,184 panels, each with a power output of 545 watts, and 950 inverters.

The power plant is expected to generate 160,740,000 kWh of electricity per year, which will be used to offset the company's electricity consumption.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

SMS group to transform Winjoy's rolling mill into an advanced copper strip production facility

Friday, June 19, 2026

Three subsidiaries of Diler Holding enter ISO 500 top 100 list

Thursday, June 18, 2026

Oğuzhan Üçok: Even if Hormuz reopens, steel and shipping trade will take 3–4 months to normalize

Tuesday, June 16, 2026

Ali Der: "The reopening of Hormuz will bring at least a 10% price correction in steel prices"

Tuesday, June 16, 2026

İSDEMİR became Türkiye’s 10th largest industrial company

Saturday, June 20, 2026
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now