12,702.00 TRY BIST 100 BIST 100
50.93 EUR EUR EUR
44.08 USD USD USD
6.41 CNY CNY CNY
0.13 CNY CNY/EUR CNY/EUR
40.19 TRY Interest Interest
92.57 USD Fossil Oil Fossil Oil
5.90 USD Copper Copper
126.41 USD Silver Silver
100.32 USD Iron Ore Iron Ore
360.00 USD Shipbreaking Scrap Shipbreaking Scrap
7,326.26 TRY Gold (gr) Gold (gr)
104.00 USD Iron Ore 61% Fe Iron Ore 61% Fe

Primetals Technologies has modernized the electric arc furnace of Çolakoğlu Metalurji

One of Türkiye’s leading steel producers, Çolakoğlu Metalurji, has completed the electric arc furnace (EAF) modernization project in collaboration with Primetals Technologies.

Primetals Technologies has modernized the electric arc furnace of Çolakoğlu Metalurji

The modernized furnace delivers significant improvements in production efficiency and energy consumption while setting new industry standards in ease of maintenance and operational reliability.

As part of the upgrade, an innovative furnace tilting device was implemented to enhance the precision and speed of furnace movements. The modernization, incorporating the electromagnetic stirrer (EMS) system supplied by ABB, positions Çolakoğlu as a leader in electric steelmaking.

Complex engineering challenges were successfully overcome

The project required the integration of new mechanical and hydraulic components into the existing EAF. The tilting mechanism, frame structures, and EMS system were precisely aligned with the furnace body and plant infrastructure. Dismantling, structural adaptation, reinstallation, and commissioning were completed within a tight four-week schedule. This process demanded flawless coordination and seamless collaboration among the design, manufacturing, and on-site teams.

Working in the confined furnace area, precise interface management, and the need for smart logistics increased the project’s complexity. All mechanical and hydraulic work was completed on time while fully maintaining safety, quality, and long-term reliability standards.

Modular approach enables fast installation

Primetals Technologies and Çolakoğlu Metalurji pre-assembled all new components using detailed 3D models and custom drawings. This modular pre-assembly significantly reduced on-site installation time and minimized interface adjustments.

As a result, the project was completed on schedule, delivering an exemplary modernization for brownfield plant upgrades in the steel industry. The new EAF system offers improved efficiency, ease of maintenance, mechanical stability, and long-term reliability.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

Innotech Steel CEO Bekir Bayın: “Steel producers should act together in global markets.”

Tuesday, March 10, 2026

Erdemir shares increased after anti-dumping decision

Tuesday, March 10, 2026

South Africa has initiated an investigation to extend safeguard measures on hexagonal bolts and screws

Tuesday, March 10, 2026

Primetals Technologies modernized Çolakoğlu Metalurji’s electric arc furnace

Tuesday, March 10, 2026
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now