Cenergy Holdings announced that Corinth Pipeworks has been awarded the line pipe supply package for the Rovuma LNG Phase 1 Project in Mozambique. The contract was awarded by the Area 4 partners led by ExxonMobil Moçambique.
Production to take place at the Thisvi plant in Greece
Under the contract, Corinth Pipeworks will manufacture approximately 250 km, totaling 120,000 tonnes, of longitudinally submerged arc welded (LSAW) steel pipes for the project’s offshore pipeline network.
The pipes will range from 20 to 24 inches in diameter, while the scope of the contract also includes anti-corrosion coating and concrete weight coating.
Production is planned to take place at the company’s Thisvi facility in Greece. The pipes will be designed to meet the demanding operating conditions of deepwater natural gas operations.
Contract valued at USD 200-250 million
Cenergy Holdings stated that the total value of the contract is estimated at between USD 200 million and USD 250 million.
Corinth Pipeworks General Manager Ilias Bekiros said that the company’s selection for the Rovuma LNG Project reflects confidence in its technical capabilities, manufacturing expertise and ability to execute complex offshore projects.
Mozambique Rovuma Venture (MRV) operates the Area 4 block in the offshore Rovuma Basin. MRV, a joint venture between ExxonMobil, Eni and CNPC, holds a 70% participation interest in the Area 4 concession, while XRG, Kogas and Empresa Nacional de Hidrocarbonetos (ENH) each hold a 10% interest.
Source : Cenergy Holdings
Comments
No comment yet.