14,396.54 TRY BIST 100 BIST 100
56.08 EUR EUR EUR
47.95 USD USD USD
7.17 CNY CNY CNY
0.13 CNY CNY/EUR CNY/EUR
40.85 TRY Interest Interest
93.44 USD Fossil Oil Fossil Oil
6.56 USD Copper Copper
106.65 USD Silver Silver
95.92 USD Iron Ore Iron Ore
377.25 USD Shipbreaking Scrap Shipbreaking Scrap
6,089.00 TRY Gold (gr) Gold (gr)
95.00 USD Iron Ore 61% Fe Iron Ore 61% Fe

Galva Hub to commission 150,000-ton galvanizing facility in Abu Dhabi

Galva Hub Metal Coating is preparing to commission the UAE’s largest hot-dip galvanizing kettle at its facility in Metal Park, Abu Dhabi. The plant is planned to have the capacity to galvanize up to 150,000 tons of steel annually.

Galva Hub to commission 150,000-ton galvanizing facility in Abu Dhabi

Galva Hub Metal Coating is preparing to commission the UAE’s largest hot-dip galvanizing kettle at its facility located in Metal Park within Khalifa Economic Zones Abu Dhabi (KEZAD). According to a statement released by the company, commissioning activities are expected to continue throughout August, with production scheduled to begin in September.

The galvanizing facility is planned to have the capacity to process up to 150,000 tons of steel per year.

16.2-meter kettle designed for large steel structures

More than 6,000 square meters of space has been allocated for galvanizing operations at the facility. The kettle is planned to be approximately 16.2 meters long, 2.7 meters wide and 3 meters deep. Thanks to its double-dip capability, the kettle will enable the galvanizing of structures up to 5.5 meters in size. This is expected to reduce the need for large steel structures to be divided into smaller sections for galvanizing or sent to facilities outside Abu Dhabi.

Will become part of the metal manufacturing ecosystem in Metal Park

The Galva Hub facility will operate in Metal Park, which focuses on metal manufacturing, processing, logistics and support services within KEZAD.

Spanning approximately 450,000 square meters, Metal Park brings together manufacturing, warehousing, logistics and business services. The facility has access to Khalifa Port and Etihad Rail connections, as well as road networks linking Abu Dhabi to other emirates and Gulf countries.

Metal Park CEO Vahid Fouladkar stated that the facility will enable the local galvanizing of large steel structures, reducing transportation and handling requirements for manufacturers operating in the region.

Galva Hub CEO Shadi Nemeh said that the facility combines the company’s more than 20 years of galvanizing experience with a large kettle that enables larger and more complex steel structures to be processed with fewer dipping operations.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

Nigeria plans to restart Delta Steel plant with USD 1.3 billion investment

Friday, August 21, 2026

Kardemir Çelik reports TL 410.4 million net profit in H1 2026

Friday, August 21, 2026

Demand outlook diverges across the Balkan steel market

Thursday, August 20, 2026

Welspun Corp receives record USD 1.8 billion pipe order

Friday, August 21, 2026
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now