9,084.77 TRY BIST 100 BIST 100
39.13 USD USD USD
5.47 CNY CNY CNY
44.35 EUR EUR EUR
0.12 CNY CNY/EUR CNY/EUR
43.86 TRY Interest Interest
64.24 USD Fossil Oil Fossil Oil
41.80 USD Silver Silver
4.68 USD Copper Copper
95.98 USD Iron Ore Iron Ore
333.00 USD Shipbreaking Scrap Shipbreaking Scrap
4,159.48 TRY Gold (gr) Gold (gr)
9,084.77 TRY BIST 100 BIST 100
39.13 USD USD USD
5.47 CNY CNY CNY
44.35 EUR EUR EUR
0.12 CNY CNY/EUR CNY/EUR
43.86 TRY Interest Interest
64.24 USD Fossil Oil Fossil Oil
41.80 USD Silver Silver
4.68 USD Copper Copper
95.98 USD Iron Ore Iron Ore
333.00 USD Shipbreaking Scrap Shipbreaking Scrap
4,159.48 TRY Gold (gr) Gold (gr)
9,084.77 TRY BIST 100 BIST 100
39.13 USD USD USD
5.47 CNY CNY CNY
44.35 EUR EUR EUR
0.12 CNY CNY/EUR CNY/EUR
43.86 TRY Interest Interest
64.24 USD Fossil Oil Fossil Oil
41.80 USD Silver Silver
4.68 USD Copper Copper
95.98 USD Iron Ore Iron Ore
333.00 USD Shipbreaking Scrap Shipbreaking Scrap
4,159.48 TRY Gold (gr) Gold (gr)

Erhallar Demir Çelik will establish a solar power plant in Aydın

Erhallar Demir Çelik Sanayi ve Ticaret AŞ, based in Karabük, is planning to build a 5 MW solar power plant in Bozdoğan, Aydın. The company will build this solar power plant to generate its own energy needs.

Erhallar Demir Çelik will establish a solar power plant in Aydın

Erhallar Solar Power Plant will be established on a total area of 57,389.89 square meters. From this area, 51,958.45 square meters will be reserved for the power plant. A total of 11,916 photovoltaic panels and 46 inverters will be used for the construction of the power plant, which has a total installed capacity of 5.0 MWe. The project will have the capacity to generate 6,494,220 kWh of electricity per year.

Project will be located 56.5 km southeast of Aydın Provincial Center and 12.7 km southeast of Bozdoğan District Center. The closest residences will be 820 meters away.

According to a statement by Erhallar Demir Çelik Sanayi ve Ticaret AŞ, no Environmental Impact Assessment was assessed as necessary for the project. However, 9.500.000 TL was estimated as the project cost. This price covers all the costs required for the project as well as machinery-equipment and unexpected outlays.

This project will be implemented in an area designated as Dry Marginal Agricultural Land by the Provincial Directorate of Agriculture and Forestry of Aydın Governorship. This will contribute significantly to minimizing the environmental impact.

Comments

No comment yet.

Only +plus subscribers can access this content.

SUBSCRIBE now to share your thoughts on the markets and get more comments.
SUBSCRIBE If you already have an account Sign In

Most read news

TMK awarded in three categories across Russia

Wednesday, May 28, 2025

US steel imports decrease in April

Wednesday, May 28, 2025

12 thousand tons of sales from Ekinciler to Syria

Wednesday, May 28, 2025

Çakmur: “We do not expect a step back in sales and margin in 2025”

Wednesday, May 28, 2025

Türkiye's foreign trade deficit in April exceeded USD 12 billion

Thursday, May 29, 2025
Follow List
Expand
Your watch list is empty

Add your favorite commodities for quick access and don't miss the latest price change news.


There are no news categories you follow
Edit Notification Preferences
E-bulletin subscription
Sign up to receive the latest news and daily iron prices by e-mail and sms
Become a Plus Subscriber Now!
Try it free for 3 days!
Subscribe Now
Neutral Prices
Be informed
Provincial Iron Prices
Comments and Analysis
Subscribe Now